Jackson and the whole metro
Construction Dumpster Rental in Jackson, MS
The right container for each phase of the job, delivered when the site needs it, swapped before it overflows.
- Licensed & insured
- Same-day in Jackson
- Flat-rate pricing
- Hinds, Madison & Rankin

Construction Dumpster Rental across the Jackson metro
A job site does not make one kind of waste. Demolition comes out heavy — concrete, block, brick, tile — then framing and drywall come out light and bulky, then the finish phase is packaging and offcuts. We size each phase on its own: a 10 yard loaded level for the heavy stuff, a 30 or 40 for the bulk, and a swap schedule so the crew never waits on a full box.
In Mississippi that matters because where a load can go depends on what is in it. Clean construction and demolition debris, concrete, brick, wood and vegetation can go to a Class I rubbish site — the City of Jackson's site in Byram charges $5 a cubic yard for it. Household garbage and mixed trash cannot; they have to go to a permitted municipal landfill. A clean load and a box sized for the weight both save you money.
At a glance
What you get with construction dumpster rental
- Containers sized by job phase — heavy demo, framing, finish
- Swap scheduling and job-site rotations so the site never waits on a full box
- 10 yard containers for concrete, brick and dirt loaded level
- 30 and 40 yard containers for bulky framing and demolition debris
- Loads tarped for the haul
- Flat pricing with the tonnage allowance stated up front
Demolition, framing, roofing and finish
Demolition debris is where the weight is. Concrete, block, brick, asphalt and tile go in 10 yards loaded level, because a 30 heaped with rubble is more than the truck can lift and more than any allowance covers. Framing and drywall go in 30s and 40s. Shingle roofs are a 10 up to about 30 squares and a 20 up to about 50.
Asbestos is an MDEQ matter. Before demolition — and before a renovation that disturbs at least 160 square feet, 260 linear feet or 35 cubic feet of regulated asbestos material — the building has to be inspected by MDEQ-certified inspectors, and MDEQ wants a notice 10 working days before any regulated demolition, whether or not asbestos is found. Individual homes of four or fewer units are generally exempt, unless they are part of a larger development. Asbestos-containing material never goes in a roll-off. We will ask what the building is before we quote a demo job.
Job-site placement and the City of Jackson
On a private lot we place where the driver can reach it and the crew can load it. A demolition in Jackson needs a permit from the City's building official before work starts (Sec. 26-1), through the Building Permits Division at City Hall, 219 S. President St; the code does not print the fee. After the demolition, the site has to be cleared of all debris within 30 days (Sec. 26-5). In a local historic district, demolition also needs a Certificate of Appropriateness from the Historic Preservation Commission. Contractors have to keep the site free of litter and remove rubbish during and right after the job (Sec. 106-89). If the container has to sit in the street, that needs the City's written authorization (Sec. 110-21).
Suitability
Is construction dumpster rental the right call?
The fastest way to get this right is to check the two lists below against what is actually in your pile.
Good fits for this service
- Demolition and tear-out debris
- Framing, drywall and finish-phase waste
- Shingle roof tear-offs
- Concrete, block, brick, asphalt and dirt loaded level
- Multi-week jobs on a swap schedule
Send these somewhere else
- Asbestos-containing material — certified abatement only
- Paint, solvents, fuel and chemicals
- Mixed heavy and light loads heaped past the rail
- Household garbage mixed into a clean debris load — it turns a rubbish-site load into a landfill load
Sizing
Which container for construction dumpster rental?
Every size below runs on this service. Match the material first, then the volume.
- 10 Yard Dumpster — Concrete, block, tile, brick and other dense debris, loaded level.
- 20 Yard Dumpster — Shingle roof tear-offs and remodel debris.
- 30 Yard Dumpster — Framing, drywall and whole-house renovation to the studs.
- 40 Yard Dumpster — Commercial demolition and multi-unit construction waste.
| Size | Dimensions | Capacity | Weight included | Best for |
|---|---|---|---|---|
| 10 Yard Dumpster | about 14 ft long × 7.5 ft wide × 3.5 ft high | about 3 pickup truck loads | 1–2 tons | Small kitchen and bath remodels, shingle roofs up to about 30 squares, concrete, brick, dirt and sod loaded level, a garage or one room. |
| 15 Yard Dumpster | about 16 ft long × 7.5 ft wide × 4.5 ft high | about 4–5 pickup truck loads | 2–3 tons | Kitchen and bath remodels, flooring and carpet tear-outs, small deck and fence removal, yard cleanups, one big room or two small ones. |
| 20 Yard Dumpster | about 22 ft long × 7.5 ft wide × 4.5 ft high | about 6 pickup truck loads | 3–4 tons | Whole-home cleanouts, multi-room renovations, shingle roofs up to about 50 squares, large landscaping jobs, storm cleanup and light demolition. |
| 30 Yard Dumpster | about 22 ft long × 7.5 ft wide × 6 ft high | about 9 pickup truck loads | 4–5 tons | Whole-house renovations, estate and rental property cleanouts, retail and office remodels, large roofs, light demolition and community cleanups. |
| 40 Yard Dumpster | about 22 ft long × 7.5 ft wide × 8 ft high | about 12 pickup truck loads | 5–6 tons | Commercial construction and demolition, full-building renovations, warehouse and office cleanouts, commercial roofing, large event and storm cleanup. |
Construction dumpster rental — the local specifics
Most cities in the metro put construction debris squarely on the owner or contractor. Clinton's code says construction and renovation waste must be transported from the site by the owner, occupant or contractor (Sec. 46-158); Brandon says building debris must be privately removed (Sec. 66-44); Pearl lists construction and demolition materials as non-collectible (Sec. 30-28). Byram does not let construction debris sit on a residential lot for more than 30 days (Sec. 302.10.4) and requires a demolition permit. Demolition permits cost $200 in Pearl and Brandon, and $200 or more by valuation in Gluckstadt; Madison requires one too. Crystal Springs keeps trucks over 10,000 pounds — ours included — on its truck routes. Canton loads go to the Canton landfill by city code. Every town page quotes the section.
Talk to a real person
Need construction dumpster rental in Jackson?
Call (601) 821-2292, describe the job in a sentence, and you will have a flat price and a delivery window before you hang up.
Open 24 hours, 7 days
Answers
Construction Dumpster Rental — your questions answered
Do you do swap-outs?
Yes. We pull the full container and drop an empty in the same trip. Most multi-week jobs book the first swap at the start.
Can I mix concrete with other debris?
You can, but it costs you. Concrete fills the weight allowance long before the box looks full, so we run a 10 for rubble alongside a 30 for the rest.
Can you deliver to a site with no address yet?
Yes — give us the nearest cross streets and a gate contact, and the driver will call ahead.
Do I need a permit for a container on a Jackson job site?
Not for the container on your own lot, as far as the City's published code says. You need the City demolition permit for demo work, a Certificate of Appropriateness in a historic district, the MDEQ notice for a regulated demolition, and written authorization if the box goes in the street. We flag it when you book.
Which cities restrict construction haulers?
Jackson permits every contract hauler by the truck, Clinton licenses haulers through the City Clerk, and Brandon requires a privilege licence approved by the board — we hold ours. Canton sends its waste to its own landfill. Each town page says what that city's code says, and we tell you straight when you call.
Service area
Construction Dumpster Rental across the Jackson metro
We run roll-off containers out of the Bailey Avenue yard to every city and town below. Jackson and the close-in cities are usually same-day; the edges of the metro are often next-day. Jackson, Clinton and Brandon license the haulers that work inside their limits, and Canton sends its garbage to its own landfill — each page says so plainly. If your town is not listed, call anyway.
